Year

2022

Commissioning Agencies

Peggy Guggenheim Collection

Commissioning Agencies

Peggy Guggenheim Collection

Client

IAC – InterActive Corp.

NewCo

Location

New York, NY

Office of Open Practice was engaged to build an all-inclusive, fixed-price renovation platform democratizing design by streamlining material procurement and eliminating hidden labor costs. Using proprietary 3D scanning technology, custom-built architectural asset libraries and material coding systems, Office of Open Practice achieved the project goal of consistently delivering innovative, high quality renovations at cost and on time. Over 100 kit-of-parts based renovations were completed using the platform over a 2-year span.

Collaborators:

Penelope Phylactopoulos, co-lead

Asset A

Design as a Kit of Parts: Vetted finishes and materials arrayed into groups of designs. All materials required for job arrive together on site, ready to install in the Kit:

Asset A

Design as a Kit of Parts: Vetted finishes and materials arrayed into groups of designs. All materials required for job arrive together on site, ready to install in the Kit:

Asset A

Design as a Kit of Parts: Vetted finishes and materials arrayed into groups of designs. All materials required for job arrive together on site, ready to install in the Kit:

Asset A

1. Space is scanned - all dimensions are logged, architectural drawings are generated.

Asset A

1. Space is scanned - all dimensions are logged, architectural drawings are generated.

Asset A

1. Space is scanned - all dimensions are logged, architectural drawings are generated.

Asset A

2. Demo down to the studs

Asset A

2. Demo down to the studs

Asset A

2. Demo down to the studs

Asset A

3. Material Kit of Parts Arrives on Site

Asset A

3. Material Kit of Parts Arrives on Site

Asset A

3. Material Kit of Parts Arrives on Site

Asset A

*All materials are apportioned per the square footage with overages pre-calculated.

Asset A

*All materials are apportioned per the square footage with overages pre-calculated.

Asset A

*All materials are apportioned per the square footage with overages pre-calculated.

Asset A

4. New finishes installed

Asset A

4. New finishes installed

Asset A

4. New finishes installed

Asset A

Renovation completed with innovative materials and minimal delays

Asset A

Renovation completed with innovative materials and minimal delays

Asset A

Renovation completed with innovative materials and minimal delays

Asset A
Asset A